Custom chandelier lead time: how long each stage takes, from drawing to delivery
Custom chandelier lead time, stage by stage: drawings, samples, production, lit trial assembly, export packing and freight, with the figures we work to.
Key points
- A custom chandelier is ready to ship about 3.5 to 5.5 weeks after its shop drawing is approved: three to five weeks of production, two days of lit trial assembly and two days of export packing.
- Sea freight adds about 45 days, so a large fixture usually needs 11 to 15 weeks from first drawings to arrival. Small pieces can travel by air.
- Our factory closes for about 14 days around Chinese New Year. Orders planned around the holiday are not affected, so order early for openings in the first months of the year.
How long does a custom chandelier take to make?
A custom chandelier takes about three to five weeks to make once its shop drawing is approved: three weeks for a small fixture, four for a medium one and five for a large or multi-section piece. Lit trial assembly and export packing add about four days, and sea freight adds about 45 days.
| Stage | Typical time | What the buyer does |
|---|---|---|
| First shop drawing | 3 days after we receive your information | Send the ceiling plan, heights and photos |
| Drawing revisions | 1 to 2 rounds, 2 to 3 days each | Reply with one combined set of comments |
| Material and color samples | About 10 days, when needed | Approve the samples promptly |
| Production | 3 weeks small, 4 medium, 5 large or multi-section | Keep the approved design fixed |
| Lit trial assembly and photos | 2 days | Check the trial photos and video |
| Export packing | 2 days | Confirm the delivery address |
| Sea freight | About 45 days | Arrange customs clearance and site delivery |
Added up in order, a project shipped by sea usually takes 11 to 15 weeks from your first drawings to the fixture’s arrival. That total is our estimate from the stages above, not a contract date; the schedule for your project is confirmed with the shop drawing.
How long do shop drawings and approval take?
We send the first shop drawing about three days after receiving your ceiling plan, heights and references. Most projects then need one or two rounds of changes, and each round takes two to three days. If glass colors or crystal need samples, allow about 10 more days before the design is final.
This stage moves at the speed of the replies. Collecting the owner’s, designer’s and contractor’s comments into one answer often saves a whole round. Our guide on what to send before a quote lists the information that gets the first drawing right.
How does fixture size change production time?
Production time depends mainly on size. A small custom chandelier takes about three weeks after drawing approval, a medium one about four weeks, and a large or multi-section fixture about five weeks. Each schedule covers forming the steel frame in our hardware department, dressing it with crystal, glass or LED parts, and wiring it.
Fitting, wiring and the lit trial all happen in our own factory, and we schedule our partners’ parts into the same plan, so one team gives one date for the whole fixture. The steps are shown in detail on our page about how custom chandeliers are made.

How long do trial assembly and export packing take?
Trial assembly and packing together take about four days. Every order is hung and lit on our factory floor with its specified light sources, then photographed and filmed so you can check it before it ships; that takes about two days. Packing the labeled sections into export crates takes about two more.
How long does sea or air freight take?
Sea freight takes about 45 days. Small pieces can go by air when the schedule is tight, while large chandeliers normally travel by sea in export crates. Allow extra time for customs clearance and for delivery from the port to the site, which depend on your country and your local agent.
What delays a custom chandelier, and how can buyers avoid it?
Common causes of delay are drawings that go through several rounds of changes, sizes changed after approval, colors chosen again after samples, and ceilings that are not ready when the fixture arrives. Fixing the design early, approving samples promptly and confirming the site date before shipping protect the schedule.
Our factory also closes for about 14 days around Chinese New Year, usually in January or February. Orders planned with the holiday in mind are not affected, but a project that starts late in the year should be ordered early. Site problems that hold up installation are covered in our large chandelier installation guide.
Can a project be rushed, or the shipment held?
Yes to both. A rush order can usually shorten the schedule by about seven days, for an extra charge. If your site is not ready when the fixture is finished, we can hold the crated shipment at the factory free of charge for one month, so it does not have to wait in a warehouse or on a building site.
When should you order for a hotel or hall opening date?
Work back from the opening date. Subtract the installation time agreed with your contractor, about 45 days of sea freight, about four days of trial and packing, three to five weeks of production and one to three weeks for drawings and samples. For a large fixture shipped by sea, order at least 15 weeks before installation starts.
For example, if installation must start on 1 March, a large fixture shipped by sea should be ordered, with complete drawings and information, by mid-November at the latest. Order earlier still, because Chinese New Year falls in between. When you have a date, request a chandelier quote and tell us the opening date with your drawings.
Send us your ceiling plan
Share a drawing, photo or sketch with the ceiling height and room size. We come back with questions, design options and a quote.